Orange County NC Website
0 <br />0 <br />4 <br />Eno River above <br />McGowan Ceek(Sit. B) <br />586 NPE (actual) <br />Corporation Lake <br />, 535'NPE <br />(538' actual NPE) <br />Seven Mile Creek (proposed)' <br />580' NPE <br />(581' actual proposed NPE) <br />WE <br />I <br />� -- Y-- 16 <br />Upper Eno/ <br />Critical Area <br />------ 2006 fN <br />Le /en� <br />jf 1/2 mile buffer West Fork <br />@ 640' NPE (643' actual) <br />1/2 mile buffer of Lake Orange <br />2 @ 615' NPE (actual) <br />i/2 mile buffer of Eno River <br />between West Fork dam <br />and 'Eno River above McGowan <br />Creek' <br />1/2 mile buffer of proposed <br />ij Lake Orange 'Eno River above McGowan Creek' <br />6151 NPE @ 585' NPE (actual) <br />(actual) 1/2 mile buffer of Corporation Lake <br />minus ridgeline area at the dam <br />(State DEM) <br />1/2 mile buffer of Lake Ben Johnston <br />and stream below Corporation Lake <br />intake point to Lake Ben Johnston <br />(State DEM) <br />1/2 mile buffer of stream <br />0 between Lake Ben Johnston <br />and Seven Mile Creek (prop) <br />F-107 1/2 mile buffer or proposed <br />Seven Mile Creek @ 580' <br />1/2 mile buffer of Rocky Run <br />Fill stream for t * he last 6011 feet <br />before entering Lake Ben Johnston <br />1994 Adopted Upper Eno Critical Area <br />�f <br />Water supply watershed <br />Hillsborough ETJ; City Limits <br />Streams <br />r.) (54'r Streams between Impoundments <br />— Rocky Run - 6011' <br />Existing Impoundments <br />S1 Proposed imundments <br />--7N� 7-8 177=17-1Z1V1-11Vpo1,4, <br />WMVF <br />Lake Ben Johnston <br />515' NPE <br />SW. <br />