Browse
Search
CFE agenda 021218
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2018
>
CFE agenda 021218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 9:32:31 AM
Creation date
3/5/2018 9:31:15 AM
Metadata
Fields
Template:
BOCC
Date
2/12/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
CFE minutes 021218
(Message)
Path:
\Advisory Boards and Commissions - Active\Commission for the Environment\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1� "I(default.asp) <br />WEST CORRIDOR STUDY <br />'S° <br />uuuuuum uuuuuuuuuuuuuuuuuuuuuuuum uuuuuuum <br />Attachment 14 <br />Welcome to the NC 54 Corridor Study Website. The purpose of this study is to better understand how <br />the NC 54 corridor is utilized and document the unique resources along this historic route. <br />The project team will use this website, and other tools, to engage with residents and commuters along the corridor. Please share <br />your comments or questions (get - involved.asp) with us and help us identify what locations (map.asp) make this corridor unique or <br />challenging. <br />Study Overview <br />The NC 54 Corridor Study is an in -depth review of the 20+ mile stretch of NC 54 between Old Fayetteville Road in Carrboro and I- <br />85 in Graham. This regionally significant roadway helps 6,000 to 15,000 vehicles per day reach work, schools, and stores, so local <br />governments are interested in opportunities and strategies to improve the roadway and support the communities alongside it. <br />Learn more)) (about.asp) <br />Study Objective <br />The goal of this study is to develop a long -term vision for this corridor, including the NC 54 roadway itself and the surrounding <br />communities. This vision is comprehensive, as it will address preservation of the area's character, economic opportunity and vitality, <br />environmental sensitivity, and transportation improvements for all users (drivers, freight, pedestrians, bicyclists, etc.). Learn more <br />(about.asp) <br />Study News <br />M Public Meeting #1 <br />V January 23, 2018 @ Rigmor House Event Center <br />V January 24, 2018 @ Graham Civic Center <br />V January 25, 2018 @ Carrboro Town Hall <br />Click for more meeting details >> (get - involved.asp) <br />
The URL can be used to link to this page
Your browser does not support the video tag.