Browse
Search
CFE agenda 010818
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2018
>
CFE agenda 010818
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 9:28:48 AM
Creation date
3/5/2018 9:27:38 AM
Metadata
Fields
Template:
BOCC
Date
1/8/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
CFE minutes 010818
(Message)
Path:
\Advisory Boards and Commissions - Active\Commission for the Environment\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
affordable housing; a few pages after identifying this problem, the DEIS includes "[a]ffordable <br />housing near transit" as one of the offsetting beneficial impacts the project will have on low - <br />income and minority populations. 13 Affordable housing should be eliminated from this list of <br />benefits in the FEIS, unless concrete and enforceable policies are instituted that guarantee access <br />to affordable housing proximate to light rail stops. <br />The DEIS observes that acquisitions and displacements required by the D-0 LRT project <br />might "be perceived as a disproportionately high and adverse effect on the east Durham <br />community in particular." 84 The DEIS lacks documentation or analysis of the businesses and <br />community resources that may be displaced due to the project. This missing information creates <br />an incomplete picture of the nature and extent of the adverse effects such displacements and <br />acquisitions will have on affected people of color and low- income communities. As such, we <br />urge GoTriangle to devote detailed discussion in the FEIS to the precise businesses and resources <br />to be displaced in the affected areas. Further, as much as possible, GoTriangle should select <br />routes that will require as few business, community resource, and residential displacements as <br />possible. Retaining community pillars is key for community cohesion. <br />We are mindful that community members have expressed concerns that the current D -O <br />LRT project does not reach East Durham, where low- income and minority populations are in <br />dire need of better access to public transportation. Instead, light rail will reach these <br />communities only during a possible later phase of light rail expansion. In the transportation <br />mitigation section, the FEIS should address coordinating connecting bus service from East <br />Durham communities to the nearest D-0 LRT stop as well as provide realistic numbers on the <br />ridership projections for D-0 LRT from East Durham. Because community members have <br />expressed that the D-0 LRT will not serve the East Durham community due to the local nature <br />of community travel, these additional actions would work toward establishing how East Durham <br />residents would get to the D-0 LRT, assessing the level of current East Durham community <br />transportation need, and firmly determining how this project can actually provide transit to those <br />lower - income, less mobile households. Indeed, since a prime part of the Purpose and Need for <br />the project is providing public transit access to lower - income, less mobile households, <br />connecting East Durham communities to this light rail project should be prioritized. <br />Finally, we urge GoTriangle to study and include in the FEIS information about the <br />estimated fares for light rail passengers. We note that the DEIS stated Go Triangle will work <br />with public transportation staff to "engage the public and complete a Transit Service and Fare <br />Equity Analysis" prior to initiating revenue service. 85 If the light rail service is cost - prohibitive <br />for low- income populations, the project will not satisfy its stated Purpose and Need, and may not <br />yield as many positive benefits for target populations as forecast by the DEIS. <br />83 DEIS at 5 -35. <br />14 Id. at 5 -30. <br />85 Id. at 3 -14. <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.