Orange County NC Website
el <br />Brumley Forest Nature Preserve trail building work day <br />TO RC is excited to have its first trail building work day with Triangle Land Conservancy <br />at their Brumley Forest Nature Preserve! Satin d a Febr <br />ua r �20 2 0 �16 8 : 30 A �M <br />Last year, TORC signed. an MOU with TI-C to partner with them in helping build. and. maintain <br />the ma lti-LIse trail at BrUITIley Forest. <br />TI-C is planning to open this property to the pUblic in the Fall of 2016. <br />The master plan calls for 12 miles of ma lti-Use trail and. 4 miles of hiking only trail. <br />https://www.tliangleland.org/explore/nature-preserves/brumley-forest-nature-preserve <br />Please be sure to register on the TI-C blink provided. below: <br />"On this workday, volunteers will hell,) prepare Brumley Forest Nature Preservefi)r its Fall 2016 <br />public opening. lasks may include building trails, constructing railing on boardwalks, <br />demolishing an old (lock, removing invasive species, etc. <br />Voltinteers should be six years of ag-e of older and minors must be accony')anied by an adult or <br />guardian. Please register so we have an approximate head count.- <br />hops: 11www. triangleland. org/ news - and - events /event /trail- crew" <br />TORC and. TI-C will provide all tools. Depending on how dry the soil is as we approach the 20th <br />will depend. on whether we are hand. building or LISilIg a machine. TI-C has contracted. with <br />Native Trails from two grants. <br />Make sure YOU dress warmly for the cold. weather, wear protective shoes or boots, bring gloves <br />and. plenty of water. <br />We will meet at the Orange COU11ty Durham Tech campus at 8:30 am and. at 8:45 we will drive <br />over to the property. <br />10 El Z <br />