Browse
Search
CFE agenda 121415
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2015
>
CFE agenda 121415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2018 10:51:13 AM
Creation date
3/2/2018 10:47:51 AM
Metadata
Fields
Template:
BOCC
Date
12/14/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
CFE minutes 121415
(Message)
Path:
\Advisory Boards and Commissions - Active\Commission for the Environment\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
45 <br />11/23/15 Page 2 of 3 <br />BOCC Impact of SL 2015 -246 (HB 44) on Orange Co. <br />These are the rules which form the basis of the stormwater regulations for almost half of <br />the County. In the absence of these rules, research will need to be done to determine <br />how the UDO would need to be modified in order to meet the requirements of state law. <br />Unfortunately, the North Carolina Department of Environment and Natural Resources <br />Energy Mineral and Land Resources (DEMLR) is right in the middle of a comprehensive <br />review of stormwater regulations, which involves significant reorganization, repeals of <br />duplications and amendments. Why is DEMLR doing this? <br />#1 S.L. 2013 -82 requires new rules for Fast -Track permitting. Minimum Design <br />Criteria (MDC) are part of the Fast -Track requirements, so they have to be <br />codified too. <br />#2 G.S. �15013-213A directs state agencies to review and update their rules every <br />10 years. <br />#3 It's a good opportunity to update & streamline. <br />Substantive changes resulting from this that will affect Orange County include: <br />1. Minimum Design Criteria (MDC) and fast -track permitting <br />2. Project density <br />3. Disconnection instead of swales <br />The recodified comprehensive rules adoption is scheduled for July of 2016. <br />Sep -Dec 2015 <br />Nov 12, 2015 <br />Jan 14, 2016 <br />Jan 15, 2016 <br />Jan 20, 2016 <br />Feb 17, 2016 <br />Mar 2016 <br />Apr 17, 2016 <br />Jul 13, 2016 <br />DEMLR develops fiscal note <br />WQC approves rule text <br />EMC approves rule & fiscal note <br />OSBM certifies fiscal note <br />DEMLR files rule & fiscal note in Register <br />Comment period begins <br />Public hearing(s) <br />Comment period ends <br />EMC adopts rules <br />SA2 Boards\BOCC\2015 Public Heariugs\Nov QPIAWork Session Items\2015 Session Law Eflects\Att 1 - InpactsOfSL2015- 246 (HB44)EC- SW- ProgOfOC_111215.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.