Browse
Search
CFE agenda 110915
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2015
>
CFE agenda 110915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2018 10:45:26 AM
Creation date
3/2/2018 10:44:01 AM
Metadata
Fields
Template:
BOCC
Date
11/9/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
CFE minutes 110915
(Message)
Path:
\Advisory Boards and Commissions - Active\Commission for the Environment\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2. (Continued) <br />UNRBA Projects <br />Given the challenges with meeting Stage II of the Falls Lake Rules, as well as the guidelines <br />outlined in the Consensus Principles document, the UNRBA is already either working on, or is <br />planning to begin, the following projects: <br />• Estimation of nutrient sources and jurisdictional loading of nutrients to Falls Lake <br />• Modeling the response of Falls Lake to nutrient input and internal lake processes <br />• Monitoring of changes in the lake as a result of compliance activities in the watershed <br />• The linkage of water quality conditions to the designated uses of Falls Lake <br />• Estimation of BMP credits for measures without DWR- established credits <br />• Support of various options under the existing regulatory framework in North Carolina <br />The UNRBA has retained a consultant to help examine options for meeting the requirements of <br />Stage II the Falls Lake Rules while incorporating the goals of the Consensus Principles. <br />According to the Framework for a Re- examination of Stage 11 of the Falls Nutrient Strategy <br />prepared by the consultant, CardnoEntrix: "The re- examination should consider existing data, <br />models, nutrient management strategies, the Consensus Principles, water quality standards <br />(including designated uses and water quality criteria), implementation costs, and regulatory <br />flexibility." <br />Water Quality Sampling <br />During July 2014, CardnoEntrix received approval from DWR for three required technical <br />memoranda that had been prepared and submitted for DWR review that describe in detail the <br />watershed sampling project that will form the foundation of the re- examination process: <br />• Quality Assurance Project Plan (QAPP) <br />• Falls Lake Watershed Monitoring Plan <br />• Modeling Framework <br />The QAPP and the Monitoring Plan describe the three to five year watershed sampling effort <br />that was initiated in August 2014. The water quality sampling program will provide information <br />for the following purposes: <br />• Determination of nutrient source allocation and jurisdictional nutrient loading to Falls <br />Lake; <br />• Falls Lake response modeling; <br />• Development of data for consideration of additional regulatory options; and <br />• Linkage of water quality conditions in Falls Lake to the designated uses of the Lake. <br />
The URL can be used to link to this page
Your browser does not support the video tag.