Browse
Search
CFE agenda 091415
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2015
>
CFE agenda 091415
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2018 10:37:11 AM
Creation date
3/2/2018 10:35:44 AM
Metadata
Fields
Template:
BOCC
Date
9/14/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
CFE minutes 091415
(Message)
Path:
\Advisory Boards and Commissions - Active\Commission for the Environment\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
T fie Nuys & Observer <br />The changes are expected to form an important link in the town's trail system and make it safer for to <br />cross busy MLK Boulevard and head downtown or west to Carrboro. Cyclists and pedestrians now go <br />down the hill, past a dangerous gas station driveway, to cross at the traffic light. <br />Concerned residents say there are better ways to safely route people than a concrete trail next to a <br />creek in the resource conservation district — land set aside to protect water quality. <br />"A river's riparian area is a delicate place, and there is usually a minimum area along every creek or river <br />that should not be messed with, in order for the body of water to stay healthy," Umstead Drive resident <br />Sue -Anne Solem recently emailed town leaders. <br />The fear is that stormwater will race down the hill, crossing the concrete unabated, and push more <br />sediment downstream, residents said. That could erode the creek, increase the potential for flooding <br />and harm aquatic life, they said. <br />Repairs to the Bolin Creek Greenway in recent years show what could happen, Mt. Bolus Road resident <br />Will Raymond said. Floodwaters in 2013 damaged the trail's edges, destroying handrails and retaining <br />walls, and creating a large landslide in one section. <br />Town leaders seem determined to move full speed ahead anyway, Raymond said. <br />"The town doesn't listen to the experts. They don't listen to the residents," he said. "I guess we're doing <br />to have to find chunks of asphalt in the creek before the town starts believing this was a bad idea." <br />
The URL can be used to link to this page
Your browser does not support the video tag.