Browse
Search
CFE agenda 020915
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Commission for the Environment
>
Agendas
>
2015
>
CFE agenda 020915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2018 10:25:48 AM
Creation date
3/2/2018 10:24:06 AM
Metadata
Fields
Template:
BOCC
Date
2/9/2015
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
CFE minutes 020915
(Message)
Path:
\Advisory Boards and Commissions - Active\Commission for the Environment\Minutes\2015
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br />ORANGE WATER AND SEWER AUTHORITY <br />OWASA0 A public, non-profit agency providing water, sewer and reclaimed mater services <br />to the Carrboro - Chapel Hill community_ <br />January 16, 2415 <br />Chair Earl McKee <br />Orange County Board of Commissioners <br />PO Box 8181 <br />Hillsborough, NC 27278 <br />Dear Chair McKee: <br />We are pleased to submit this report on our services and initiatives in 2414 for your February 3, <br />2415 meeting. I request a couple of minutes to make brief comments about our work and will be <br />available to receive feedback and answer questions. <br />Preliminary engineering study for sewers in Historic Ropers Road Area <br />OWASA entered an interlocal agreement with Orange County in June 2414 to do a preliminary <br />engineering study for extending sewers in the Historic Rogers Road Area. In the summer and <br />fall of 2414, we worked with the Jackson Center to inform residents about plans for the study <br />and to get permission from 57 owners to go on their land to gather information needed for the <br />study. <br />Our consultant, URS Corporation (URS), is checking the topography at several locations, getting <br />soil samples and checking the location of underground utilities in the study area. URS will use <br />the information to evaluate the potential routes for sewers and update the preliminary estimate of <br />costs (initial preliminary estimate was about $5.8 million). Our consultant's overall preliminary <br />engineering report is on schedule for completion in March 2415. <br />To keep the project moving, our staff is working with County staff to draft a new interlocal <br />agreement for the next phase of the project including design, bidding, permitting and installation <br />of sewers. We understand the importance of this project and we will continue to work with <br />County staff to provide our assistance. <br />Biosolids Management <br />We are conducting a two -part study of biosolids management. The first part, which staff <br />recently completed, was a comparison of the social, financial, and environmental performance of <br />land application of liquid biosolids versus dewatering all of our biosolids for recycling at a <br />private compost facility. A copy of staff's report is er . <br />On January 8, 2415, after receiving comments from several citizens including several Orange <br />County farmers participating in our program, we agreed to continue recycling liquid biosolids on <br />farmland through 2415, and continue recycling about half of our biosolids through composting of <br />dewatered biosolids. <br />400 Jones Ferry Road Equal Opportunity Employer Voice (919) 968 -4421 <br />Carrboro, NC 27510 -2001 Printed on Recycled Paper www.owasa.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.