Browse
Search
Agenda - 10-03-2006-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 10-03-2006
>
Agenda - 10-03-2006-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:27:38 AM
Creation date
8/29/2008 9:51:50 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2006
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20061003
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FINANCIAL IMPACT: Conducting a Cultural and Archeological Survey involves hiring a <br />qualified consulting firm. The cost varies considerably due the size of the subject property and <br />the scope of the work, primarily the amount of subsurface investigation that is required. The <br />cost of conducting cultural and archaeological surveys would likely be an expenditure not <br />already factored into the overall- cost of a development project (at least in the short term). The <br />proposed policy to require cultural and archaeological surveys would apply to all County <br />development projects, including those conducted by other partners that the County funds, such <br />as new schools. <br />RECOMMENDATION(S): The Manager recommends that the Board consider the attached <br />policy and provide direction to staff, or if deemed adequate, adopt the policy with any changes <br />as needed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.