Browse
Search
Agenda - 10-03-2006-5k
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 10-03-2006
>
Agenda - 10-03-2006-5k
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:29:11 AM
Creation date
8/29/2008 9:51:16 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2006
Document Type
Agenda
Agenda Item
5k
Document Relationships
Minutes - 20061003
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S <br />2. Construction administration services which extend beyond the established Contract Completion <br />Date, through no fault of the Designer, including default of any Contractor. <br />3. Modifying drawings and specifications as a result of Contractors' equipment substitutions. failure <br />to coordinate or sequence the work, or other fault of the Contractor(s). <br />[31LL,INGS/['AYMLN"["S: Im~oices +aill be presented monthly, based nn progress during the month. <br />Payments will be due on a net 30-day basis. Financing charges on balance beyond 30 days will be 1-I/2°%° <br />per month (18% APR). If we should have to seek legal action to effect collection, and +ve prevail in <br />litigation, then all costs associated +vith collecting overdue accounts +vill be recoverable. If payments arc <br />withheld or disputed, then +ve retain the right to suspend further services wail the account is current. <br />Submitted by: <br />RBEC6, NOLAND R McGLRAT'1I, INC. <br />Stephen C. Kaufman, PE <br />Accepted by: <br />September 14, ?006 <br />Date Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.