Browse
Search
2018-057-E AMS Foundation Xperts Clean fill and install drainage 127 E King St
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-057-E AMS Foundation Xperts Clean fill and install drainage 127 E King St
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2018 4:11:17 PM
Creation date
3/1/2018 12:06:53 PM
Metadata
Fields
Template:
Contract
Date
1/2/2018
Contract Starting Date
1/2/2018
Contract Ending Date
6/30/2018
Contract Document Type
Agreement - Construction
Amount
$17,865.00
Document Relationships
R 2018-057 AMS - Foundation Xperts Clean fill and install drainage 127 E King St
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: AF341A71- 841F- 473D- 91DCB- 85676177FFF7 <br />FX: 129E.KINGSTHILLSBOROUGH August 21, 2017 <br />Contract Submitted To: <br />Orange County <br />Attn: Angel Barnes — Capital Projects Manager <br />131 W. Margaret Lane, Hillsborough, NC 27278 <br />919 - 245 -2628 (home) Email: abarnes cDorangecountync.gov <br />RE: 129 E. King Street, Hillsborough, NC 27278 <br />LEFT SIDE CRAWLSPACE WALL <br />Install an interior French Drain System along the entire left side crawlspace wall. The French Drain <br />System will be installed at the footing level of the wall and be sloped so water flows to the existing <br />drain line in the crawlspace. This estimate assumes a maximum footing depth of 3 feet to the <br />bottom of the footing, if conditions exist that are different from that, a price would be determined <br />and agreed upon by both parties prior to proceeding with work. <br />TOTAL COST: $ 7,565.00 <br />Conditions: <br />Terms And Responsibility Upon Acceptance of Proposal and Contract: <br />• Foundation Xperts, LLC, will call ULOCO (Utility Locating Service) to have any gas lines, phone lines, power lines, cable lines, <br />water lines (where applicable), are properly marked before starting the contracted job. <br />g.4L,4N0F,r1kF kPON)Og COMPLETION <br />We accept cash ana check. 4 ncOnthle seY ✓GGe cG/GTYge o f 1.5?o per ntaptth will be aa'a'ea to aksa therea fter <br />accrue upon the unpaca balance o f all invoices that are 10 aa(y -- past a'ue. <br />Founaation xperts is a NC Licensea ceneraC Contractor,��1 <br />Acceptance of Proposal: The above prices and conditions are satisfactory and are accepted. You are authorized to <br />do the work accepted. I /We have read, understand and agree to comply with the proposal terms including the <br />payment of finance charges on past due balances and, if applicable, all collection costs plus reasonable attorney's <br />fee in the event action is commenced against me for nonpayment. <br />Date of Acceptance: Signature: <br />Proposal Submitted By: _ irk. Date: 12/11/201) <br />* *PLEASE READ ALL CONDITIONS AND WARRANTIES WRITTEN IN ACCORDANCE WITH THIS CONTRACTAND INITIAL: <br />This proposal is valid for thirty (30) days upon submission (see date above). Once accepted and signed by <br />owner this proposal becomes a binding contract. <br />
The URL can be used to link to this page
Your browser does not support the video tag.