Browse
Search
Agenda - 10-03-2006 - Agenda
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 10-03-2006
>
Agenda - 10-03-2006 - Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 2:31:44 AM
Creation date
8/29/2008 9:50:17 AM
Metadata
Fields
Template:
BOCC
Date
10/3/2006
Document Type
Agenda
Document Relationships
Minutes - 20061003
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUEL USE <br />GASOLINE <br />USAGE (GALLONS) VARI<~NCE <br />2005 2006 August I'TD TOTAL <br />August YTD TOTAL August YTD TOTA QTY °lo QTI' <br />22,719 164,993 23,104 160,974 385 1.7% -4019 -2.5% <br />DIESEL <br />USAGE (GALLONS) VARIANCE <br />2005 2006 August YTD TOTAL <br />August YTD TOTAL August YTD TOTA QTY % QTY <br />4,595 31,597 4,970 35,238 375 8.2% 3,691 10.5% <br />NC?TES: <br />This report identifies fuel used for the operation of Cowity vehicles and equipment. It does not <br />include fuel used by the Town of Hillsborough, or outside agencies (AEC, Orange Enterprises, etc.) <br />(1) Animal Shelter vehicles fuel use was not captw•ed vl previous periods, but is shown vi the <br />August 2006 fuel figures. <br />(2) Central Services no longer provides mail/courier service <br />(3) Use of diesel fuel by OPT began with diesel vehicle on new Chapel Hill route in January 2006 <br />(4) E1L1 S reduced gasoline usage, but increased diesel usage due to replacemeiu of older gasoline <br />powered aanbulances with newer, diesel powered models. <br />(5) Uses estunates of fuel usage by EIv1 S from the Town of Chapel Hill for July of 2005. <br />ENERGY USE <br />NATURAL GAS <br />Usage(Therms) January -August 2046 <br />Actual Baseline Projection Diff.(Actual-Baseline} % Difference from Baseline <br />August 3,19$ 4,325 -1,126.75 -26.054% <br />Year-To-Date 148,552 112,260 -3,708 -3.30% <br />ELECTRICITY <br />Usage(KW} January -August 2006 <br />Month Actual Baseline Projection Diff.(Actual-Baseline) % Difference from Baseline <br />August 629,513 606,277 23,236 3.83% <br />Year-To-Date 3,559,772 3,894,645 -30,833 -4.79% <br />Public Works developed a model to estimate changes in energy usage from atwo-year baseline period (January 2004 <br />through December 2005). This model is used to effectively "remove" or adjust for the effect of outside air temperatures <br />(Heating Degree Days (HDD) and Cooling Degree Days (GDD)) on energy use in Gounty buildings. <br />"Actual" usage presents the number of kilowatt hours used during the most recent month as well as usage for the <br />calendar year to date. "Baseline Projection" is a projection of the quantity of electricity that would have been used, <br />adjusted for HDD and CDD, based on usage in the two-year baseline period. The "Difference," if a negative value, <br />demonstrates that less energy was used than projected, resulting in a savings. If a positive value, the "Difference" <br />indicates that more energy was used than projected. <br />In order to allow appropriate "apples-to-apples" comparisons to direct changes in usage, outside lighting has not been <br />included, as accounts are often rolled up for several buildings (i.e., outside lighting for the Government Services Annex <br />includes not only the Annex but also Government Services Center, the Sheriff Department and the New Courthouse). <br />"NOTE: due to utility billing cycles and dates, the most current complete information for natural gas and electricity usage <br />is for the month of August 2006. <br />
The URL can be used to link to this page
Your browser does not support the video tag.