Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />1. Temperature Change (Range): 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), <br />material surfaces. <br />1.4 SUBMITTALS <br />A. Product Data: Manufacturer's product information, specifications, and installation instructions <br />for walkway cover components and accessories. <br />B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work. <br />1. Include structural analysis data signed and sealed by the qualified professional engineer <br />responsible for their preparation. <br />C. Samples for Initial Selection: For pre- engineered metal canopy with factory- applied color <br />finishes. <br />D. Welding certificates. <br />E. Qualification Data: For manufacturer and engineer. <br />F. Warranties: Special warranties specified in this Section. <br />1.5 QUALITY ASSURANCE <br />A. Installer Qualifications: Manufacturer of pre- engineered metal canopy. <br />B. Installer Qualifications: Capable of assuming engineering responsibility and performing work <br />of this Section. <br />1. Engineering Responsibility: Preparation of data for pre- engineered metal canopy <br />including Shop Drawings based on testing and engineering analysis of manufacturer's <br />standard units in assemblies similar to those indicated for this Project and submission of <br />reports of tests performed on manufacturer's standard assemblies. <br />C. Engineer Qualifications: A professional engineer licensed in the State of North Carolina. <br />D. Product Options: Drawings indicate size, profiles, and dimensional requirements of pre - <br />engineered metal canopy and are based on the specific system indicated. Refer to Division 1 <br />Section "Product Requirements." <br />1. Do not modify intended aesthetic effects, as judged solely by Architect, except with <br />Architect's approval. If modifications are proposed, submit comprehensive explanatory <br />data to Architect for review. <br />E. Welding: Qualify procedures and personnel according to AWS D1.2, "Structural Welding <br />Code -- Aluminum." <br />ALUMINUM WALKWAY CANOPY (Addendum #1) 105305-2 <br />