Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />B. Roof -Paver Walkways: Install walkway roof pavers according to manufacturer's written <br />instructions in locations indicated, to form walk surface. Leave 1/2 inch (12 mm) of space <br />between adjacent roof pavers. <br />3.8 FIELD QUALITY CONTROL <br />A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections. <br />B. Final Roof Inspection: Arrange for roofing system manufacturer's technical personnel to <br />inspect roofing installation on completion. <br />C. Repair or remove and replace components of membrane roofing system where inspections <br />indicate that they do not comply with specified requirements. <br />D. Additional inspections, at Contractor's expense, will be performed to determine compliance of <br />replaced or additional work with specified requirements. <br />3.9 PROTECTING AND CLEANING <br />A. Protect membrane roofing system from damage and wear during remainder of construction <br />period. When remaining construction will not affect or endanger roofing, inspect roofing for <br />deterioration and damage, describing its nature and extent in a written report, with copies to <br />Architect and Owner. <br />B. Correct deficiencies in or remove membrane roofing system that does not comply with <br />requirements; repair substrates; and repair or reinstall membrane roofing system to a condition <br />free of damage and deterioration at time of Acceptance and according to warranty requirements. <br />END OF SECTION 075423 <br />THERMOPLASTIC POLYOLEFIN (TPO) ROOFING (Alternate G -2) (Addendum #1) 075423-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.