Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />3.4 INSULATION INSTALLATION <br />A. Coordinate installing membrane roofing system components so insulation is not exposed to <br />precipitation or left exposed at the end of the workday. <br />B. Comply with membrane roofing system and insulation manufacturer's written instructions for <br />installing roof insulation. <br />C. Install tapered insulation under area of roofing to conform to slopes indicated. <br />D. Install insulation under area of roofing to achieve required thickness. Where overall insulation <br />thickness is 2.7 inches (68 mm) or greater, install two or more layers with joints of each <br />succeeding layer staggered from joints of previous layer a minimum of 6 inches (150 mm) in <br />each direction. <br />E. Trim surface of insulation where necessary at roof drains so completed surface is flush and does <br />not restrict flow of water. <br />F. Install insulation with long joints of insulation in a continuous straight line with end joints <br />staggered between rows, abutting edges and ends between boards. Fill gaps exceeding 1/4 inch <br />(6 mm) with insulation. <br />1. Cut and fit insulation within 1/4 inch (6 mm) of nailers, projections, and penetrations. <br />G. Mechanically Fastened and Adhered Insulation: Install each layer of insulation and secure first <br />layer of insulation to deck using mechanical fasteners specifically designed and sized for <br />fastening specified board -type roof insulation to deck type. <br />1. Fasten first layer of insulation according to requirements in FM Approvals' "RoofNav" <br />for specified Windstorm Resistance Classification. <br />2. Set each subsequent layer of insulation in ribbons of bead - applied insulation adhesive, <br />firmly pressing and maintaining insulation in place. <br />H. Install cover boards over insulation with long joints in continuous straight lines with end joints <br />staggered between rows. Offset joints of insulation below a minimum of 6 inches (150 mm) in <br />each direction. Loosely butt cover boards together and fasten to roof deck. <br />Fasten cover boards according to requirements in FM Approvals' "RoofNav" for <br />specified Windstorm Resistance Classification. <br />3.5 MECHANICALLY FASTENED MEMBRANE ROOFING INSTALLATION <br />A. Mechanically fasten membrane roofing over area to receive roofing and install according to <br />roofing system manufacturer's written instructions. <br />For in- splice attachment, install membranes roofing with long dimension perpendicular to <br />steel roof deck flutes. <br />THERMOPLASTIC POLYOLEFIN (TPO) ROOFING (Alternate G -2) (Addendum #1) 075423 -9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.