Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />B. Store liquid materials in their original undamaged containers in a clean, dry, protected location <br />and within the temperature range required by roofing system manufacturer. Protect stored <br />liquid material from direct sunlight. <br />1. Discard and legally dispose of liquid material that cannot be applied within its stated <br />shelf life. <br />C. Protect roof insulation materials from physical damage and from deterioration by sunlight, <br />moisture, soiling, and other sources. Store in a dry location. Comply with insulation <br />manufacturer's written instructions for handling, storing, and protecting during installation. <br />D. Handle and store roofing materials and place equipment in a manner to avoid permanent <br />deflection of deck. <br />1.10 PROJECT CONDITIONS <br />A. Weather Limitations: Proceed with installation only when existing and forecasted weather <br />conditions permit roofing system to be installed according to manufacturer's written instructions <br />and warranty requirements. <br />1.11 WARRANTY <br />A. Special Warranty: Manufacturer's standard or customized form, without monetary limitation, in <br />which manufacturer agrees to repair or replace components of membrane roofing system that <br />fail in materials or workmanship within specified warranty period. <br />1. Special warranty includes membrane roofing, base flashings, roof insulation, fasteners, <br />cover boards, roofing accessories, and other components of membrane roofing system. <br />2. Warranty Period: 15 years from date of Acceptance. <br />B. Special Project Warranty: Submit roofing Installer's warranty, on warranty form at end of this <br />Section, signed by Installer, covering the Work of this Section, including all components of <br />membrane roofing system such as membrane roofing, base flashing, roof insulation, fasteners, <br />cover boards, substrate boards, vapor retarders, roof pavers, and walkway products, for the <br />following warranty period: <br />1. Warranty Period: Two years from date of Acceptance. <br />THERMOPLASTIC POLYOLEFIN (TPO) ROOFING (Alternate G -2) (Addendum #1) 075423 -4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.