Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />E. Warranties: Sample of special warranties. <br />1.7 CLOSEOUT SUBMITTALS <br />A. Maintenance Data: For roofing system to include in maintenance manuals. <br />1.8 QUALITY ASSURANCE <br />A. Manufacturer Qualifications: A qualified manufacturer that is FM Approvals approved for <br />membrane roofing system identical to that used for this Project. <br />B. Installer Qualifications: A qualified firm that is approved, authorized, or licensed by membrane <br />roofing system manufacturer to install manufacturer's product and that is eligible to receive <br />manufacturer's special warranty. <br />C. Source Limitations: Obtain components including roof insulation and fasteners for membrane <br />roofing system from same manufacturer as membrane roofing or approved by membrane <br />roofing manufacturer. <br />D. Preinstallation Roofing Conference: Conduct conference at Project site. <br />1. Meet with Owner, Architect, Owner's insurer if applicable, testing and inspecting agency <br />representative, roofing Installer, roofing system manufacturer's representative, deck <br />Installer, and installers whose work interfaces with or affects roofing, including installers <br />of roof accessories and roof - mounted equipment. <br />2. Review methods and procedures related to roofing installation, including manufacturer's <br />written instructions. <br />3. Review and finalize construction schedule and verify availability of materials, Installer's <br />personnel, equipment, and facilities needed to make progress and avoid delays. <br />4. Examine deck substrate conditions and finishes for compliance with requirements, <br />including flatness and fastening. <br />5. Review structural loading limitations of roof deck during and after roofing. <br />6. Review base flashings, special roofing details, roof drainage, roof penetrations, <br />equipment curbs, and condition of other construction that will affect roofing system. <br />7. Review governing regulations and requirements for insurance and certificates if <br />applicable. <br />8. Review temporary protection requirements for roofing system during and after <br />installation. <br />9. Review roof observation and repair procedures after roofing installation. <br />1.9 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled <br />with manufacturer's name, product brand name and type, date of manufacture, approval or <br />listing agency markings, and directions for storing and mixing with other components. <br />THERMOPLASTIC POLYOLEFIN (TPO) ROOFING (Alternate G -2) (Addendum #1) 075423 -3 <br />