Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />ilia <br />Addendum No. 1 Page 2 <br />B. CIVIL DRAWINGS <br />1. Sheet C2.0: clarify the following roof leader and storm drainage pipe sizes: the <br />roof leader leaving the building is a 4" diameter pipe per Sheet P -1. All storm <br />drainage pipes connecting to the wet columns of the aluminum canopy shall be 4" <br />diameter pipe until the second 45- degree bend in the pipe. At the second bend in <br />those storm drainage pipes, the pipe size shall increase to 6" diameter. At the <br />clean -out, the pipe transitions to 8" diameter pipe per Sheet C2.0. <br />2. Sheet C2.0: add details 1 and 2/C2.0 per the attached bulletin drawing, ABD -l. <br />This bulletin drawing provides details of the concrete sidewalks and the exterior <br />stair and railing. <br />3. Sheet C2.0: clarify that the asphalt patching section, required for the trenching of <br />the storm drainage pipe, shall be 6" ABC and 2" asphalt surface course. <br />4. Sheet C2.0: add a note that reads "All landscaping shall be provided and <br />installed by the Owner ". <br />B. PLUMBING DRAWINGS <br />1. Sheet P -1: clarify the roof leaders shall be PVC. <br />END OF ADDENDUM <br />Attachments: Pre -Bid Conference Minutes and Sign -in Sheet <br />Supplementary General Conditions (Addendum #1) <br />Form of Proposal (Addendum #1) <br />Specification Section 012300 — Alternates (Addendum #1) <br />Specification Section 075423 — Thermoplastic Polyolefin (TPO) Roofing (Alternate G -2) <br />(Addendum #1) <br />Specification Section 105305 Aluminum Walkway Canopy (Addendum #1) <br />Bulletin Drawing ABD -1 <br />222 Cloister Court • Chapel Hill, NC 27514 • (919) 401 -8586 <br />
The URL can be used to link to this page
Your browser does not support the video tag.