Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />ilia <br />Addendum No. 1 <br />PROJECT: PASSMORE CENTER ADDITION AND RENOVATION <br />ORANGE COUNTY <br />HILLSBOROUGH, NORTH CAROLINA <br />CRA PROJECT #: 1606 <br />DATE: 11/30/17 <br />Page 1 <br />+++++++++++++++++++++++++++++++++++++ + + + + + + + + + + + + + + + + + + + + + + + + + + + + + ++ <br />MODIFICATIONS TO THE CONTRACT DOCUMENTS FOR THE ABOVE -NAMED <br />PROJECT SHALL BE MADE AS DESCRIBED BELOW AND SHALL BE INCLUDED <br />IN THE BID AMOUNTS: <br />A. PRE -BID CONFERENCE <br />The Pre -Bid Conference was held at 3:00pm, Friday, November 17, 2017 in <br />Room 004 of the Orange County West Campus Office Building, Hillsborough, <br />North Carolina. See the attached conference minutes and the attached sign -in <br />sheet for a summary of those items covered. These minutes shall be included in <br />the contract documents. <br />B. GENERAL SPECIFICATIONS <br />1. Supplementary General Conditions: replace the Supplementary General <br />Conditions with the attached Supplementary General Conditions (Addendum #1). <br />The revised section adds information regarding the construction schedule and the <br />associated liquidated damages. <br />2. Form of Proposal: replace the Form of Proposal with the attached Form of <br />Proposal (Addendum #1). The revised form of proposal adds Alternates G -2 and <br />G -3 to the form of proposal. <br />3. Specification Section 012300 — Alternates replace Specification Section 012300 <br />— Alternates with the attached Specification Section 012300 — Alternates <br />(Addendum #1). The revised section adds Alternates G -2 and G -3 to the project. <br />4. Specification Section 064021 — Interior Architectural Woodwork: on page <br />064021 -2, delete Section 1.5D Quality Standard. Delete AWI Quality Certification <br />Program requirements. <br />5. Specification Section 075423 — Thermoplastic Polyolefin (TPO) Roofing <br />(Alternate G -2) (Addendum #1): add Specification Section 075423 — <br />Thermoplastic Polyolefin (TPO) Roofing (Alternate G -2) (Addendum #1) to the <br />project manual. This section shall be used for Alternate G -2 only. <br />6. Specification Section 105305 — Aluminum Walkway Canopy (Addendum #1): <br />add Specification Section 105305 — Aluminum Walkway Canopy (Addendum #1) <br />to the project manual. <br />222 Cloister Court • Chapel Hill, NC 27514 • (919) 401 -8586 <br />
The URL can be used to link to this page
Your browser does not support the video tag.