Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />3. Replace defective piping using new materials, and repeat inspections until defects are <br />within allowances specified. <br />4. Reinspect and repeat procedure until results are satisfactory. <br />B. Test new piping systems, and parts of existing systems that have been altered, extended, or <br />repaired, for leaks and defects. <br />1. Do not enclose, cover, or put into service before inspection and approval. <br />2. Test completed piping systems according to requirements of authorities having <br />jurisdiction. <br />3. Schedule tests and inspections by authorities having jurisdiction with at least 24 hours' <br />advance notice. <br />4. Submit separate report for each test. <br />5. Gravity -Flow Storm Drainage Piping: Test according to requirements of authorities <br />having jurisdiction, UNI -13-6, and the following: <br />a. Exception: Piping with soiltight joints unless required by authorities having <br />jurisdiction. <br />b. Option: Test plastic piping according to ASTM F 1417. <br />C. Option: Test concrete piping according to ASTM C 924 (ASTM C 924M). <br />C. Leaks and loss in test pressure constitute defects that must be repaired. <br />D. Replace leaking piping using new materials, and repeat testing until leakage is within <br />allowances specified. <br />ki10 =W�1 .3a F1 00 <br />A. Clean interior of piping of dirt and superfluous materials. Flush with water. <br />END OF SECTION 334100 <br />UTILITY STORM DRAINAGE PIPING 334100-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.