Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 329100 - EXTERIOR PLANT PREPARATION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Planting soils. <br />B. Related Sections: <br />1. Division 31 "Earthwork" for excavation, filling, and rough grading and for subsurface <br />aggregate drainage and drainage backfill materials. <br />1.3 DEFINITIONS <br />A. Backfill: The earth used to replace or the act of replacing earth in an excavation. <br />B. Duff Layer: The surface layer of native topsoil that is composed of mostly decayed leaves, <br />twigs, and detritus. <br />C. Finish Grade: Elevation of finished surface of planting soil. <br />D. Manufactured Topsoil: Soil produced off -site by homogeneously blending mineral soils or sand <br />with stabilized organic soil amendments to produce topsoil or planting soil. <br />E. Pesticide: A substance or mixture intended for preventing, destroying, repelling, or mitigating a <br />pest. This includes insecticides, miticides, herbicides, fungicides, rodenticides, and <br />molluscicides. It also includes substances or mixtures intended for use as a plant regulator, <br />defoliant, or desiccant. <br />F. Pests: Living organisms that occur where they are not desired, or that cause damage to plants, <br />animals, or people. These include insects, mites, grubs, mollusks (snails and slugs), rodents <br />(gophers, moles, and mice), unwanted plants (weeds), fungi, bacteria, and viruses. <br />G. Planting Area: Areas to be planted. <br />H. Planting Soil: Standardized topsoil; existing, native surface topsoil; existing, in -place surface <br />soil; imported topsoil; or manufactured topsoil that is modified with soil amendments and <br />perhaps fertilizers to produce a soil mixture best for plant growth. <br />EXTERIOR PLANT PREPARATION 329100-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.