Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />Curing Compound: Apply uniformly in continuous operation by power spray or roller <br />according to manufacturer's written instructions. Recoat areas that have been subjected <br />to heavy rainfall within three hours after initial application. Maintain continuity of <br />coating, and repair damage during curing period. <br />3.9 PAVING TOLERANCES <br />A. Comply with tolerances in ACI 117 and as follows: <br />1. Elevation: 3/4 inch (19 mm). <br />2. Thickness: Plus 3/8 inch (10 mm), minus 1/4 inch (6 mm). <br />3. Surface: Gap below 10 -foot- (3 -m -) long, unleveled straightedge not to exceed 1/2 inch <br />(13 mm). <br />4. Alignment of Tie -Bar End Relative to Line Perpendicular to Paving Edge: 1/2 inch per <br />12 inches (13 mm per 300 mm) of tie bar. <br />5. Lateral Alignment and Spacing of Dowels: 1 inch (25 mm). <br />6. Vertical Alignment of Dowels: 1/4 inch (6 mm). <br />7. Alignment of Dowel -Bar End Relative to Line Perpendicular to Paving Edge: 1/4 inch <br />per 12 inches (6 mm per 300 mm) of dowel. <br />8. Joint Spacing: 3 inches (75 mm). <br />9. Contraction Joint Depth: Plus 1/4 inch (6 mm), no minus. <br />10. Joint Width: Plus 1/8 inch (3 mm), no minus. <br />3.10 WHEEL STOPS <br />A. Install wheel stops in bed of adhesive applied as recommended by manufacturer. <br />B. Securely attach wheel stops to paving with not less than two galvanized steel dowels located at <br />one - quarter to one -third points. Install dowels in drilled holes in the paving and bond dowels to <br />wheel stop. Recess head of dowel beneath top of wheel stop. <br />3.11 FIELD QUALITY CONTROL <br />A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections. <br />B. Testing Services: Testing of composite samples of fresh concrete obtained according to <br />ASTM C 172 shall be performed according to the following requirements: <br />Testing Frequency: Obtain at least one composite sample for each 100 cu. yd. (76 cu. m) <br />or fraction thereof of each concrete mixture placed each day. <br />a. When frequency of testing will provide fewer than five compressive- strength tests <br />for each concrete mixture, testing shall be conducted from at least five randomly <br />selected batches or from each batch if fewer than five are used. <br />CONCRETE PAVING 321313-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.