Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />adherence to acrylic surface and are UV and water resistant for five years for application <br />intended. <br />1. Custom Paint Colors: Match Pantone color matching system. <br />2. Color: As selected by Architect from manufacturer's full range. <br />2.3 FABRICATION <br />A. General: Provide manufacturer's standard signs of configurations indicated. <br />1. Welded Connections: Comply with AWS standards for recommended practices in shop <br />welding. Provide welds behind finished surfaces without distortion or discoloration of <br />exposed side. Clean exposed welded surfaces of welding flux and dress exposed and <br />contact surfaces. <br />2. Mill joints to tight, hairline fit. Form joints exposed to weather to exclude water <br />penetration. <br />3. Preassemble signs in the shop to greatest extent possible. Disassemble signs only as <br />necessary for shipping and handling limitations. Clearly mark units for reassembly and <br />installation, in location not exposed to view after final assembly. <br />4. Conceal fasteners if possible; otherwise, locate fasteners where they will be <br />inconspicuous. <br />2.4 FINISHES, GENERAL <br />A. Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for <br />recommendations for applying and designating finishes. <br />B. Protect mechanical finishes on exposed surfaces from damage by applying a strippable, <br />temporary protective covering before shipping. <br />C. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are <br />acceptable if they are within one -half of the range of approved Samples. Noticeable variations <br />in the same piece are not acceptable. Variations in appearance of other components are <br />acceptable if they are within the range of approved Samples and are assembled or installed to <br />minimize contrast. <br />2.5 ACRYLIC SHEET FINISHES <br />A. Colored Coatings for Acrylic Sheet: For copy and background colors, provide colored coatings, <br />including inks, dyes, and paints, that are recommended by acrylic manufacturers for optimum <br />adherence to acrylic surface and that are UV and water resistant for five years for application <br />intended. <br />SIGNAGE 104313-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.