Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />a. Equipment, including panelboards. <br />b. Uninsulated metal piping. <br />C. Uninsulated plastic piping. <br />d. Pipe hangers and supports. <br />e. Metal conduit. <br />f. Plastic conduit. <br />g. Duct, equipment, and pipe insulation having cotton or canvas insulation covering <br />or other paintable jacket material. <br />h. Other items as directed by Architect. <br />2. Paint portions of internal surfaces of metal ducts, without liner, behind air inlets and <br />outlets that are visible from occupied spaces. <br />3.4 CLEANING AND PROTECTION <br />A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from <br />Project site. <br />B. After completing paint application, clean spattered surfaces. Remove spattered paints by <br />washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. <br />C. Protect work of other trades against damage from paint application. Correct damage to work of <br />other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and <br />leave in an undamaged condition. <br />D. At completion of construction activities of other trades, touch up and restore damaged or <br />defaced painted surfaces. <br />3.5 INTERIOR PAINTING SCHEDULE <br />A. Steel Substrates: <br />1. Latex over Alkyd Primer System: <br />a. Prime Coat: Primer, alkyd, anti - corrosive, for metal, MPI #79 or primer, alkyd, <br />quick dry, for metal, MPI #76. <br />b. Intermediate Coat: Latex, interior, matching topcoat. <br />C. Topcoat: Latex, interior, semi - gloss, (Gloss Level 5), MPI #54. <br />B. Gypsum Board Substrates: <br />1. Latex System: <br />a. Prime Coat: Latex, interior, matching topcoat. <br />b. Intermediate Coat: Latex, interior, matching topcoat. <br />C. Topcoat: Latex, interior, flat, (Eggshell), MPI #53. <br />END OF SECTION 099123 <br />INTERIOR PAINTING 099123-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.