Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />[MV E E M% \1► MM2 M,4 to] D1 LT, %741121:7 I <br />A. Furnish extra materials that match products installed and that are packaged with protective <br />covering for storage and identified with labels describing contents. <br />1. Paint: 5 percent, but not less than 1 gal. (3.8 L) of each material and color applied. <br />1.6 QUALITY ASSURANCE <br />A. Mockups: Apply mockups of each paint system indicated and each color and finish selected to <br />verify preliminary selections made under Sample submittals and to demonstrate aesthetic effects <br />and set quality standards for materials and execution. <br />1. Architect will select one surface to represent surfaces and conditions for application of <br />each paint system specified in Part 3. <br />a. Vertical and Horizontal Surfaces: Provide samples of at least 100 sq. ft. (9 sq. m). <br />b. Other Items: Architect will designate items or areas required. <br />2. Final approval of color selections will be based on mockups. <br />a. If preliminary color selections are not approved, apply additional mockups of <br />additional colors selected by Architect at no added cost to Owner. <br />3. Approval of mockups does not constitute approval of deviations from the Contract <br />Documents contained in mockups unless Architect specifically approves such deviations <br />in writing. <br />4. Subject to compliance with requirements, approved mockups may become part of the <br />completed Work if undisturbed at time of Substantial Completion. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A. Store materials not in use in tightly covered containers in well - ventilated areas with ambient <br />temperatures continuously maintained at not less than 45 deg F (7 deg C). <br />1. Maintain containers in clean condition, free of foreign materials and residue. <br />2. Remove rags and waste from storage areas daily. <br />1.8 FIELD CONDITIONS <br />A. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are <br />between 50 and 95 deg F (10 and 35 deg C). <br />B. Do not apply paints when relative humidity exceeds 85 percent; at temperatures less than 5 <br />deg F (3 deg C) above the dew point; or to damp or wet surfaces. <br />INTERIOR PAINTING 099123-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.