Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. Paint surfaces behind movable items same as similar exposed surfaces. Before final <br />installation, paint surfaces behind permanently fixed items with prime coat only. <br />3. Paint both sides and edges of exterior doors and entire exposed surface of exterior door <br />frames. <br />B. If undercoats or other conditions show through topcoat, apply additional coats until cured film <br />has a uniform paint finish, color, and appearance. <br />C. Apply paints to produce surface films without cloudiness, spotting, holidays, laps, brush marks, <br />roller tracking, runs, sags, ropiness, or other surface imperfections. Cut in sharp lines and color <br />breaks. <br />D. Painting Fire Suppression, Plumbing, HVAC, Electrical, Communication, and Electronic Safety <br />and Security Work: <br />1. Paint the following work where exposed to view: <br />a. Equipment, including panelboards and switch gear. <br />b. Exposed Metal Ductwork <br />fG���l �1�11►[�.�ti��Z�71���JIY[�)►1 <br />A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from <br />Project site. <br />B. After completing paint application, clean spattered surfaces. Remove spattered paints by <br />washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. <br />C. Protect work of other trades against damage from paint application. Correct damage to work of <br />other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and <br />leave in an undamaged condition. <br />D. At completion of construction activities of other trades, touch up and restore damaged or <br />defaced painted surfaces. <br />3.5 EXTERIOR PAINTING SCHEDULE <br />A. Steel Substrates: <br />I. Alkyd System: <br />a. Prime Coat: Shop primer specified in Section 051200 "Structural Steel Framing" <br />where substrate is specified. <br />b. Topcoat: Alkyd, exterior, semi -gloss (Gloss Level 5), MPI #94. <br />END OF SECTION 099113 <br />EXTERIOR PAINTING 099113-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.