Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. Exposed Edge, Transition, and other Accessory Stripping: 12 -inch- (300 -mm -) long <br />Samples. <br />D. Product Schedule: For carpet tile. Use same designations indicated on Drawings. <br />E. Qualification Data: For Installer. <br />F. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified <br />testing agency. <br />G. Maintenance Data: For carpet tiles to include in maintenance manuals. Include the following: <br />1. Methods for maintaining carpet tile, including cleaning and stain - removal products and <br />procedures and manufacturer's recommended maintenance schedule. <br />2. Precautions for cleaning materials and methods that could be detrimental to carpet tile. <br />H. Warranty: Special warranty specified in this Section. <br />1.4 QUALITY ASSURANCE <br />A. Installer Qualifications: An experienced installer who is certified by the Floor Covering <br />Installation Board or who can demonstrate compliance with its certification program <br />requirements. <br />B. Fire- Test - Response Characteristics: Provide products with the critical radiant flux classification <br />indicated in Part 2, as determined by testing identical products per ASTM E 648 by an <br />independent testing and inspecting agency acceptable to authorities having jurisdiction. <br />1.5 DELIVERY, STORAGE, AND HANDLING <br />A. Comply with CRI 104, Section 5, "Storage and Handling." <br />1.6 PROJECT CONDITIONS <br />A. Comply with CRI 104, Section 7.2, "Site Conditions; Temperature and Humidity" and <br />Section 7.12, "Ventilation." <br />B. Environmental Limitations: Do not install carpet tiles until wet work in spaces is complete and <br />dry, and ambient temperature and humidity conditions are maintained at the levels indicated for <br />Project when occupied for its intended use. <br />C. Do not install carpet tiles over concrete slabs until slabs have cured and are sufficiently dry to <br />bond with adhesive and concrete slabs have pH range recommended by carpet tile <br />manufacturer. <br />D. Where demountable partitions or other items are indicated for installation on top of carpet tiles, <br />install carpet tiles before installing these items. <br />CARPET TILE 096810-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.