Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />3. Close and seal tightly all partly used sealant containers and store protected in well <br />ventilated fire -safe area at moderate temperature. <br />4. Place used sealant tubes and other containers in areas designated for hazardous materials. <br />1.6 PROJECT CONDITIONS <br />A. Maintain temperatures within range recommended by manufacturer, but not less than 70 deg F <br />(21 deg C) or more than 95 deg F (35 deg C, in spaces to receive floor tile during the following <br />time periods: <br />1. 48 hours before installation. <br />2. During installation. <br />3. 48 hours after installation. <br />B. After postinstallation period, maintain temperatures within range recommended by <br />manufacturer, but not less than 55 deg F (13 deg C) or more than 95 deg F (35 deg Q. <br />C. Close spaces to traffic during floor covering installation. <br />D. Close spaces to traffic for 48 hours after floor covering installation. <br />E. Install resilient products after other finishing operations, including painting, have been <br />completed. <br />1.7 EXTRA MATERIALS <br />A. Furnish extra materials described below that match products installed and that are packaged <br />with protective covering for storage and identified with labels describing contents. <br />1. Floor Tile: Furnish 1 box for every 50 boxes or fraction thereof, of each type, color, and <br />pattern of floor tile installed. <br />2. Resilient Wall Base and Accessories: Furnish not less than 10 linear feet (3 linear m) for <br />every 500 linear feet (150 linear m) or fraction thereof, of each type, color, pattern, and <br />size of resilient product installed. <br />PART2- PRODUCTS <br />2.1 MANUFACTURERS <br />A. Products: Subject to compliance with requirements, provide one of the products listed in other <br />Part 2 articles. <br />2.2 LUXURY VINYL TILE, LVT <br />A. Luxury Vinyl Plank Flooring by Armstrong World Industries, Inc. or a comparable product of <br />one of the following: <br />RESILIENT FLOOR TILE 096519-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.