Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 092900 - GYPSUM BOARD <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Interior gypsum board. <br />B. Related Requirements: <br />1. Section 092216 "Non - Structural Metal Framing" for non - structural framing and <br />suspension systems that support gypsum board panels. <br />1.3 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />B. Samples: For the following products: <br />1. Trim Accessories: Full -size Sample in 12 -inch- (300 -mm -) long length for each trim <br />accessory indicated. <br />1.4 DELIVERY, STORAGE AND HANDLING <br />A. Store materials inside under cover and keep them dry and protected against weather, <br />condensation, direct sunlight, construction traffic, and other potential causes of damage. Stack <br />panels flat and supported on risers on a flat platform to prevent sagging. <br />1.5 FIELD CONDITIONS <br />A. Environmental Limitations: Comply with ASTM C 840 requirements or gypsum board <br />manufacturer's written recommendations, whichever are more stringent. <br />B. Do not install paper -faced gypsum panels until installation areas are enclosed and conditioned. <br />GYPSUM BOARD 092900-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.