Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />B. Protect glass from contact with contaminating substances resulting from construction <br />operations, including weld splatter. If, despite such protection, contaminating substances do <br />come into contact with glass, remove substances immediately as recommended by glass <br />manufacturer. <br />C. Examine glass surfaces adjacent to or below exterior concrete and other masonry surfaces at <br />frequent intervals during construction, but not less than once a month, for buildup of dirt, scum, <br />alkaline deposits, or stains; remove as recommended in writing by glass manufacturer. <br />D. Remove and replace glass that is broken, chipped, cracked, or abraded or that is damaged from <br />natural causes, accidents, and vandalism, during construction period. <br />E. Wash glass on both exposed surfaces in each area of Project not more than four days before date <br />scheduled for inspections that establish date of Substantial Completion. Wash glass as <br />recommended in writing by glass manufacturer. <br />END OF SECTION 088000 <br />GLAZING 088000- 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.