Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />D. Boxed Power Supplies: Locate power supplies as indicated or, if not indicated, above <br />accessible ceilings. Verify location with Architect. <br />1. Configuration: Provide least number of power supplies required to adequately serve <br />doors with electrified door hardware. <br />E. Stops: Provide floor stops for doors unless wall or other type stops are indicated in door <br />hardware schedule. Do not mount floor stops where they will impede traffic. <br />F. Perimeter Gasketing: Apply to head and jamb, forming seal between door and frame. <br />3.4 ADJUSTING <br />A. Initial Adjustment: Adjust and check each operating item of door hardware and each door to <br />ensure proper operation or function of every unit. Replace units that cannot be adjusted to <br />operate as intended. Adjust door control devices to compensate for final operation of heating <br />and ventilating equipment and to comply with referenced accessibility requirements. <br />1. Door Closers: Adjust sweep period to comply with accessibility requirements and <br />requirements of authorities having jurisdiction. <br />3.5 CLEANING AND PROTECTION <br />A. Clean adjacent surfaces soiled by door hardware installation. <br />B. Clean operating items as necessary to restore proper function and finish. <br />C. Provide final protection and maintain conditions that ensure that door hardware is without <br />damage or deterioration at time of Substantial Completion. <br />END OF SECTION 087100 <br />DOOR HARDWARE 087100- 12 <br />