Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. Comply with the following maximum opening -force requirements: <br />a. Interior, Non - Fire -Rated Hinged Doors: 5 lbf (22.2 N) applied perpendicular to <br />door. <br />b. Fire Doors: Minimum opening force allowable by authorities having jurisdiction. <br />Adjust door closer sweep periods so that, from an open position of 70 degrees, the door <br />will take at least 3 seconds to move to a point 3 inches (75 mm) from the latch, measured <br />to the leading edge of the door. <br />I. Preinstallation Conference: Conduct conference at Project site. <br />1. Review and finalize construction schedule and verify availability of materials, Installer's <br />personnel, equipment, and facilities needed to make progress and avoid delays. <br />2. Inspect and discuss preparatory work performed by other trades. <br />3. Inspect and discuss electrical roughing -in for electrified door hardware. <br />4. Review sequence of operation for each type of electrified door hardware. <br />5. Review required testing, inspecting, and certifying procedures. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A. Inventory door hardware on receipt and provide secure lock -up for door hardware delivered to <br />Project site. <br />B. Tag each item or package separately with identification coordinated with the final door <br />hardware schedule, and include installation instructions, templates, and necessary fasteners with <br />each item or package. <br />1.8 COORDINATION <br />A. Installation Templates: Distribute for doors, frames, and other work specified to be factory <br />prepared. Check Shop Drawings of other work to confirm that adequate provisions are made <br />for locating and installing door hardware to comply with indicated requirements. <br />B. Security: Coordinate installation of door hardware, keying, and access control with Owner's <br />security consultant. <br />C. Electrical System Roughing -In: Coordinate layout and installation of electrified door hardware <br />with connections to power supplies and building safety and security systems. <br />D. Existing Openings: Where hardware components are scheduled for application to existing <br />construction or where modifications to existing door hardware are required, field verify existing <br />conditions and coordinate installation of door hardware to suit opening conditions and to <br />provide proper door operation. <br />DOOR HARDWARE 087100-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.