Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 084229 - SLIDING AUTOMATIC ENTRANCES <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes exterior, sliding, power- operated automatic entrances. <br />1.3 DEFINITIONS <br />A. AAADM: American Association of Automatic Door Manufacturers. <br />B. Activation Device: A control that, when actuated, sends an electrical signal to the door operator <br />to open the door. <br />1.4 COORDINATION <br />A. Coordinate sizes and locations of recesses in concrete floors for recessed sliding tracks that <br />control automatic entrances. Concrete, reinforcement, and formwork requirements are specified <br />elsewhere. <br />B. Templates: Distribute for doors, frames, and other work specified to be factory prepared for <br />installing automatic entrances. <br />C. Coordinate hardware with doors, frames, and related work to ensure proper size, thickness, <br />hand, function, and finish. Coordinate hardware for automatic entrances with hardware required <br />for rest of Project. <br />D. Electrical System Roughing -in: Coordinate layout and installation of automatic entrances with <br />connections to power supplies. <br />1.5 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1.6 ACTION SUBMITTALS <br />A. Product Data: For each type of product. <br />SLIDING AUTOMATIC ENTRANCES 084229- 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.