Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />3.3 FIELD QUALITY CONTROL <br />A. Testing Agency: Owner will engage a qualified independent testing and inspecting agency to <br />perform field tests and inspections and prepare test reports. <br />B. Testing Services: Testing and inspecting of representative areas to determine compliance of <br />installed systems with specified requirements shall take place as follows and in successive <br />stages as indicated on Drawings. Do not proceed with installation of the next area until test <br />results for previously completed areas show compliance with requirements. <br />Water Spray Test: Before installation of interior finishes has begun, a minimum area of <br />75 feet (23 m) by 1 story of aluminum -framed systems designated by Architect shall be <br />tested according to AAMA 501.2 and shall not evidence water penetration. <br />C. Repair or remove work where test results and inspections indicate that it does not comply with <br />specified requirements. <br />D. Additional testing and inspecting, at Contractor's expense, will be performed to determine <br />compliance of replaced or additional work with specified requirements. <br />MEN E OMM1Ml,164Cel <br />A. Entrances: Adjust operating hardware for smooth operation according to hardware <br />manufacturers' written instructions. <br />For doors accessible to people with disabilities, adjust closers to provide a 3- second <br />closer sweep period for doors to move from a 70- degree open position to 3 inches (75 <br />mm) from the latch measured to the leading door edge. <br />END OF SECTION 084110 <br />ALUMINUM- FRAMED STOREFRONTS 084110-10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.