Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />2. At interior doors, provide silencers at stops to prevent metal -to -metal contact. Install <br />three silencers on strike jamb of single -door frames and two silencers on head of frames <br />for pairs of doors. <br />F. Doors: Reinforce doors as required for installing hardware. <br />1. At pairs of exterior doors, provide sliding weather stripping retained in adjustable strip <br />mortised into door edge. <br />2. At exterior doors, provide weather sweeps applied to door bottoms. <br />G. Hardware Installation: Factory install hardware to the greatest extent possible. Cut, drill, and <br />tap for factory- installed hardware before applying finishes. <br />H. After fabrication, clearly mark components to identify their locations in Project according to <br />Shop Drawings. <br />f►•>��: lu 1►l lu 1► loo-M! <br />A. General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal <br />Products" for recommendations for applying and designating finishes. <br />B. Finish designations prefixed by AA comply with the system established by the Aluminum <br />Association for designating aluminum finishes. <br />C. High- Performance Organic Finish (3 -Coat Fluoropolymer): AA- C12C40R1x (Chemical Finish: <br />cleaned with inhibited chemicals; Chemical Finish: conversion coating; Organic Coating: <br />manufacturer's standard 3 -coat, thermocured system consisting of specially formulated <br />inhibitive primer, fluoropolymer color coat, and clear fluoropolymer topcoat, with both color <br />coat and clear topcoat containing not less than 70 percent polyvinylidene fluoride resin by <br />weight). Prepare, pretreat, and apply coating to exposed metal surfaces to comply with <br />AAMA 2605 and with coating and resin manufacturers' written instructions. <br />1. Color and Gloss: As selected by Architect from manufacturer's full range. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine areas, with Installer present, for compliance with requirements for installation <br />tolerances and other conditions affecting performance of work. <br />1. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION <br />A. General: <br />1. Comply with manufacturer's written instructions. <br />ALUMINUM- FRAMED STOREFRONTS 084110-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.