Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />B. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 INSTALLATION <br />A. Hardware: For installation, see Section 087100 "Door Hardware" and Section 087111 "Door <br />Hardware (Descriptive Specification)." <br />B. Installation Instructions: Install doors to comply with manufacturer's written instructions and <br />the referenced quality standard, and as indicated. <br />1. Install fire -rated doors in corresponding fire -rated frames according to NFPA 80. <br />C. Factory- Fitted Doors: Align in frames for uniform clearance at each edge. <br />D. Factory- Finished Doors: Restore finish before installation if fitting or machining is required at <br />Project site. <br />3.3 ADJUSTING <br />A. Operation: Rehang or replace doors that do not swing or operate freely. <br />B. Finished Doors: Replace doors that are damaged or that do not comply with requirements. <br />Doors may be repaired or refinished if work complies with requirements and shows no evidence <br />of repair or refinishing. <br />END OF SECTION 081416 <br />FLUSH WOOD DOORS 081416-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.