Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />A. Factory fit doors to suit frame - opening sizes indicated. Comply with clearance requirements of <br />referenced quality standard for fitting unless otherwise indicated. <br />1. Comply with requirements in NFPA 80 for fire -rated doors. <br />B. Factory machine doors for hardware that is not surface applied. Locate hardware to comply <br />with DHI- WDHS -3. Comply with final hardware schedules, door frame Shop Drawings, <br />DHI Al 15 -W series standards, and hardware templates. <br />1. Coordinate with hardware mortises in metal frames to verify dimensions and alignment <br />before factory machining. <br />C. Openings: Cut and trim openings through doors in factory. <br />1. Light Openings: Trim openings with moldings of material and profile indicated. <br />2. Glazing: Factory install glazing in doors indicated to be factory finished. Comply with <br />applicable requirements in Section 088000 "Glazing." <br />2.6 FACTORY FINISHING <br />A. General: Comply with referenced quality standard for factory finishing. Complete fabrication, <br />including fitting doors for openings and machining for hardware that is not surface applied, <br />before finishing. <br />1. Finish faces, all four edges, edges of cutouts, and mortises. Stains and fillers may be <br />omitted on bottom edges, edges of cutouts, and mortises. <br />B. Finish doors at factory. <br />C. Transparent Finish: <br />1. Grade: Custom. <br />2. Finish: WDMA TR -4 conversion varnish. <br />3. Staining: As selected by Architect from manufacturer's full range. <br />4. Effect: Open -grain finish. <br />5. Sheen: Satin. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine doors and installed door frames before hanging doors. <br />1. Verify that frames comply with indicated requirements for type, size, location, and swing <br />characteristics and have been installed with level heads and plumb jambs. <br />2. Reject doors with defects. <br />FLUSH WOOD DOORS 081416-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.