Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />1.5 QUALITY ASSURANCE <br />A. Installer Qualifications: An employer of workers trained and approved by manufacturer. <br />B. Source Limitations: Obtain standard steel doors and frames through one source from a single <br />manufacturer. <br />C. Preinstallation Conference: Conduct conference at Project site to comply with requirements in <br />Division 1 Section "Project Management and Coordination." <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver doors and frames palletized, wrapped, or crated to provide protection during transit and <br />Project -site storage. Do not use nonvented plastic. <br />1. Provide additional protection to prevent damage to finish of factory - finished doors and <br />frames. <br />B. Store doors and frames under cover at Project site. Place units in a vertical position with heads <br />up, spaced by blocking, on minimum 4 -inch- (102 -mm -) high wood blocking. Avoid using <br />nonvented plastic or canvas shelters that could create a humidity chamber. <br />1. If wrappers on doors become wet, remove cartons immediately. Provide minimum 1/4- <br />inch (6 -mm) space between each stacked door to permit air circulation. <br />1.7 PROJECT CONDITIONS <br />A. Field Measurements: Verify openings by field measurements before fabrication and indicate <br />measurements on Shop Drawings. <br />1.8 COORDINATION <br />A. Coordinate installation of anchorages for standard steel frames. Furnish setting drawings, <br />templates, and directions for installing anchorages, including sleeves, concrete inserts, anchor <br />bolts, and items with integral anchors, that are to be embedded in concrete or masonry. Deliver <br />such items to Project site in time for installation. <br />PART 2- PRODUCTS <br />2.1 MANUFACTURERS <br />A. Manufacturers: Subject to compliance with requirements, provide products by one of the <br />following: <br />1. Amweld Building Products, LLC. <br />2. Benchmark Doors; a division of General Products Co., Inc. <br />HOLLOW METAL FRAMES 081115-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.