Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />D. Fire - Test - Response Characteristics: Provide membrane roofing materials with the fire -test- <br />response characteristics indicated as determined by testing identical products per test method <br />below by UL, FMG, or another testing and inspecting agency acceptable to authorities having <br />jurisdiction. Materials shall be identified with appropriate markings of applicable testing and <br />inspecting agency. <br />Exterior Fire -Test Exposure: Class A; ASTM E 108, for application and roof slopes <br />indicated. <br />E. Preinstallation Conference: Conduct conference at Project site. Comply with requirements in <br />Division 1 Section "Project Management and Coordination." Review methods and procedures <br />related to roofing system including, but not limited to, the following: <br />1. Meet with Owner; Architect; Owner's insurer if applicable; testing and inspecting agency <br />representative; roofing Installer; roofing system manufacturer's representative; deck <br />Installer; and installers whose work interfaces with or affects roofing, including installers <br />of roof accessories and roof - mounted equipment. <br />2. Review methods and procedures related to roofing installation, including manufacturer's <br />written instructions. <br />3. Review and finalize construction schedule and verify availability of materials, Installer's <br />personnel, equipment, and facilities needed to make progress and avoid delays. <br />4. Examine deck substrate conditions and finishes for compliance with requirements, <br />including flatness and fastening. <br />5. Review structural loading limitations of roof deck during and after roofing. <br />6. Review base flashings, special roofing details, roof drainage, roof penetrations, <br />equipment curbs, and condition of other construction that will affect roofing system. <br />7. Review governing regulations and requirements for insurance and certificates if <br />applicable. <br />8. Review temporary protection requirements for roofing system during and after <br />installation. <br />9. Review roof observation and repair procedures after roofing installation. <br />1.7 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled <br />with manufacturer's name, product brand name and type, date of manufacture, and directions for <br />storing and mixing with other components. <br />B. Store liquid materials in their original undamaged containers in a clean, dry, protected location <br />and within the temperature range required by roofing system manufacturer. Protect stored <br />liquid material from direct sunlight. <br />Discard and legally dispose of liquid material that cannot be applied within its stated <br />shelf life. <br />C. Protect roof insulation materials from physical damage and from deterioration by sunlight, <br />moisture, soiling, and other sources. Store in a dry location. Comply with insulation <br />manufacturer's written instructions for handling, storing, and protecting during installation. <br />BALLASTED EPDM MEMBRANE ROOFING 075310-3 <br />