Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />B. Product Test Reports: Based on evaluation of comprehensive tests performed by a qualified <br />testing agency, for fiber- cement siding. <br />C. Research/Evaluation Reports: For each type of fiber - cement siding required, from ICC -ES. <br />D. Sample Warranty: For special warranty. <br />1.7 CLOSEOUT SUBMITTALS <br />A. Maintenance Data: For each type of product, including related accessories, to include in <br />maintenance manuals. <br />1.8 MAINTENANCE MATERIAL SUBMITTALS <br />A. Furnish extra materials that match products installed and that are packaged with protective <br />covering for storage and identified with labels describing contents. <br />1. Furnish full lengths of fiber- cement siding including related accessories, in a quantity <br />equal to 2 percent of amount installed. <br />1.9 QUALITY ASSURANCE <br />A. Mockups: Build mockups to verify selections made under Sample submittals and to demonstrate <br />aesthetic effects and to set quality standards for fabrication and installation. <br />1. Build mockups for fiber - cement siding including accessories. <br />a. Size: 48 inches long by 48 inches high. <br />b. Include outside corner on one end of mockup and inside corner on other end. <br />2. Approval of mockups does not constitute approval of deviations from the Contract <br />Documents contained in mockups unless Architect specifically approves such deviations <br />in writing. <br />3. Subject to compliance with requirements, approved mockups may become part of the <br />completed Work if undisturbed at time of Substantial Completion. <br />1.10 DELIVERY, STORAGE, AND HANDLING <br />A. Deliver and store packaged materials in original containers with labels intact until time of use. <br />B. Store materials on elevated platforms, under cover, and in a dry location. <br />1.11 WARRANTY <br />A. Special Warranty: Manufacturer agrees to repair or replace products that fail in materials or <br />workmanship within specified warranty period. <br />1. Failures include, but are not limited to, the following: <br />FIBER- CEMENT SIDING 074646-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.