Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 074646 - FIBER - CEMENT SIDING <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section includes fiber - cement siding. <br />B. Related Requirements: <br />1. Section 061000 "Rough Carpentry" for wood furring, grounds, nailers, and blocking. <br />2. Section 072500 "Weather Barriers" for weather- resistive barriers. <br />1.3 COORDINATION <br />A. Coordinate siding installation with flashings and other adjoining construction to ensure proper <br />sequencing. <br />1.4 PREINSTALLATION MEETINGS <br />A. Preinstallation Conference: Conduct conference at Project site. <br />1.5 ACTION SUBMITTALS <br />A. Product Data: For each type of product include construction details, material descriptions, <br />dimensions of individual components and profiles, and finishes. <br />B. Samples for Initial Selection: For fiber- cement siding including related accessories. <br />C. Samples for Verification <br />1. 12- inch - long -by- actual -width Sample of siding. <br />2. 24- inch - wide -by -36 -inch- (900 -mm -) high Sample panel of siding assembled on plywood <br />backing. <br />3. 12- inch - long -by- actual -width Samples of trim and accessories. <br />1.6 INFORMATIONAL SUBMITTALS <br />A. Product Certificates: For each type of fiber- cement siding. <br />FIBER- CEMENT SIDING 074646-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.