Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />E. Fire - Test - Response Characteristics: Where fire- retardant materials or products are indicated, <br />provide materials and products with specified fire- test - response characteristics as determined by <br />testing identical products per test method indicated by UL, ITS, or another testing and <br />inspecting agency acceptable to authorities having jurisdiction. Identify with appropriate <br />markings of applicable testing and inspecting agency in the form of separable paper label or, <br />where required by authorities having jurisdiction, imprint on surfaces of materials that will be <br />concealed from view after installation. <br />F. Preinstallation Conference: Conduct conference at Project site to comply with requirements in <br />Division 1 Section "Project Management and Coordination." <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Do not deliver woodwork until painting and similar operations that could damage woodwork <br />have been completed in installation areas. If woodwork must be stored in other than installation <br />areas, store only in areas where environmental conditions comply with requirements specified <br />in "Project Conditions" Article. <br />1.7 PROJECT CONDITIONS <br />A. Environmental Limitations: Do not deliver or install woodwork until building is enclosed, wet <br />work is complete, and HVAC system is operating and maintaining temperature between 60 and <br />90 deg F (16 and 32 deg C) and relative humidity between 43 and 70 percent during the <br />remainder of the construction period. <br />B. Field Measurements: Where woodwork is indicated to fit to other construction, verify <br />dimensions of other construction by field measurements before fabrication, and indicate <br />measurements on Shop Drawings. Coordinate fabrication schedule with construction progress <br />to avoid delaying the Work. <br />Locate concealed framing, blocking, and reinforcements that support woodwork by field <br />measurements before being enclosed, and indicate measurements on Shop Drawings. <br />1.8 COORDINATION <br />A. Coordinate sizes and locations of framing, blocking, furring, reinforcements, and other related <br />units of Work specified in other Sections to ensure that interior architectural woodwork can be <br />supported and installed as indicated. <br />B. Hardware Coordination: Distribute copies of approved hardware schedule specified in <br />Division 8 Section 'Door Hardware (Scheduled by Naming Products)" to fabricator of <br />architectural woodwork; coordinate Shop Drawings and fabrication with hardware <br />requirements. <br />INTERIOR ARCHITECTURAL WOODWORK 064021 -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.