Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 061000 - ROUGH CARPENTRY <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 1 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. This Section includes the following: <br />1. Wood blocking and nailers. <br />2. Wood furring and grounds. <br />3. Sheathing. <br />B. Related Sections include the following: <br />1. Division 1 Section "Construction Waste Management" for reporting requirements. <br />1.3 DEFINITIONS <br />A. Rough Carpentry: Carpentry work not specified in other Sections and not exposed, unless <br />otherwise indicated. <br />1.4 SUBMITTALS <br />1. Product Data: For each type of process and factory- fabricated product. <br />1.5 QUALITY ASSURANCE <br />A. Source Limitations for Fire - Retardant- Treated Wood: Obtain each type of fire- retardant - treated <br />wood product through one source from a single producer. <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Stack lumber, plywood, and other panels; place spacers between each bundle to provide air <br />circulation. Provide for air circulation around stacks and under coverings. <br />B. Waste Management: <br />1. Separate wood waste in accordance with the Waste Management Plan and place in <br />designated areas in the following categories for recycling: <br />ROUGH CARPENTRY 061000-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.