Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 055213 - PIPE AND TUBE RAILINGS <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Steel pipe and tube railings. <br />B. Related Sections: <br />1. Division 05 Section "Metal Stairs" for steel tube railings associated with metal stairs. <br />2. Division 09 Section "Non - Structural Metal Framing" for metal backing for anchoring <br />railings. <br />1.3 PERFORMANCE REQUIREMENTS <br />A. Delegated Desijzn: Design railings, including comprehensive engineering analysis by a <br />qualified professional engineer, using performance requirements and design criteria indicated. <br />B. General: In engineering railings to withstand structural loads indicated, determine allowable <br />design working stresses of railing materials based on the following: <br />1. Steel: 72 percent of minimum yield strength. <br />C. Structural Performance: Railings shall withstand the effects of gravity loads and the following <br />loads and stresses within limits and under conditions indicated: <br />1. Handrails and Top Rails of Guards: <br />a, Uniform load of 50 lbf/ ft. (0.73 kN /m) applied in any direction. <br />b. Concentrated load of 200 lbf (0.89 kN) applied in any direction. <br />C. Uniform and concentrated loads need not be assumed to act concurrently. <br />2. Infill of Guards: <br />a. Concentrated load of 50 Ibf (0.22 kN) applied horizontally on an area of 1 sq. ft. <br />(0.093 sq. m). <br />b. Infill load and other loads need not be assumed to act concurrently. <br />PIPE AND TUBE RAILINGS 055213-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.