Orange County NC Website
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />width and thickness indicated and stud or stud -track solid blocking of width and thickness <br />matching studs. Fasten flat straps to stud flanges and secure solid blocking to stud webs <br />or flanges. <br />a). Install solid blocking at 96 -inch centers. <br />2). Bridging: Cold- rolled steel channel, welded or mechanically fastened to webs of punched <br />studs. <br />3). Bridging: Combination of flat, taut, steel sheet straps of width and thickness indicated and <br />stud -track solid blocking of width and thickness to match studs. Fasten flat straps to stud <br />flanges and secure solid blocking to stud webs or flanges. <br />4). Bridging: Proprietary bridging bars installed according to manufacturer's written <br />instructions. <br />Install miscellaneous framing and connections, including stud kickers, web stiffeners, clip <br />angles, continuous angles, anchors, fasteners, and stud girts, to provide a complete and stable <br />wall - framing system. <br />FIELD QUALITY CONTROL <br />a. Testing: Owner will engage a qualified independent testing and inspecting agency to perform <br />field tests and inspections and prepare test reports. <br />b. Field and shop welds will be subject to testing and inspecting. <br />C. Testing agency will report test results promptly and in writing to Contractor and Architect. <br />d. Remove and replace work where test results indicate that it does not comply with specified <br />requirements. <br />e. Additional testing and inspecting, at Contractor's expense, will be performed to determine <br />compliance of replaced or additional work with specified requirements. <br />6. REPAIRS AND PROTECTION <br />a. Provide final protection and maintain conditions, in a manner acceptable to manufacturer and <br />Installer, that ensure that cold - formed metal framing is without damage or deterioration at time of <br />Substantial Completion. <br />END OF SECTION <br />COLD - FORMED METAL FRAMING 054000- 10 <br />