Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 054000 - COLD - FORMED METAL FRAMING <br />PART 1 - GENERAL <br />RELATED DOCUMENTS <br />a. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 1 Specification Sections, apply to this Section. <br />2. SUMMARY <br />a. This Section includes the following: <br />1). Exterior non -load- bearing wall framing. <br />b. Related Sections include the following: <br />1). Division 5 Section "Metal Fabrications" for masonry shelf angles and connections. <br />2). Division 9 Section "Gypsum Board Assemblies" for interior non -load- bearing, metal -stud <br />framing and ceiling- suspension assemblies. <br />PERFORMANCE REQUIREMENTS <br />a. Structural Performance: Provide cold - formed metal framing capable of withstanding design <br />loads within limits and under conditions indicated. <br />1). Design Loads: Design framing systems to withstand design loads calculated in <br />accordance with ASCE 7 -05 using the following parameters: <br />a). Design Wind Speed: 90 mph. <br />b). Exposure Category: C <br />c). Importance Factor: 1.00. <br />2). Deflection Limits: Design framing systems to withstand design loads without deflections <br />greater than the following: <br />a). Exterior Non - Load - Bearing Framing providing back -up for brick: Horizontal <br />deflection of 1/600 of the wall height. <br />b). Exterior Non - Load - Bearing Framing providing back up for metal panels: <br />Horizontal deflection of 1/240 of the wall height. <br />3). Design framing systems to provide for movement of framing members without damage or <br />overstressing, sheathing failure, connection failure, undue strain on fasteners and anchors, <br />COLD - FORMED METAL FRAMING 054000-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.