Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />E. AISI Specifications: Comply with calculated structural characteristics of steel deck according <br />to AISI's "North American Specification for the Design of Cold- Formed Steel Structural <br />Members." <br />F. FMG Listing: Provide steel roof deck evaluated by FMG and listed in its "Approval Guide, <br />Building Materials" for Class 1 fire rating and Class 1 -90 windstorm ratings. <br />G. Welding Inspection: All decking welds shall be inspected by the Architect prior to covering. <br />Notify the Architect in writing forty-eight (48) hours prior to completing welds for each major <br />area. <br />1.5 SUBMITTALS <br />A. Shop and Erection Drawings shall be submitted for all metal decking to the Architect for <br />approval. Drawings shall indicate layout, types of specified materials and accessories, gauges <br />to be supplied, anchorage details, all conditions requiring closure panels, supplementary <br />framing, sump pans, cant strips, cut openings, special jointing or other accessories. Drawings <br />shall include layout for all shear studs to be applied through deck units. Manufacture or <br />fabricating of any materials or the performing of any work prior to the approval of shop <br />drawings will be entirely at the risk of the Contractor. <br />B. Product Data: For each type of deck, accessory, and product indicated <br />C. The Contractor shall submit the manufacturer's specifications, load tables, and installation <br />instructions for each type specified. <br />D. Welding certificates. <br />E. Field quality - control test and inspection reports. <br />1.6 DELIVERY, STORAGE AND HANDLING <br />A. Steel deck units shall be protected against damage in transit to the jobsite. <br />B. If site storage is necessary, steel deck units shall be stacked on wood blocking clear of the <br />ground and tilted slightly to insure against the entrapment of water. <br />C. The steel deck units shall be hoisted to each individual floor as required and rough spread. <br />PART2- PRODUCTS <br />2.1 ROOF DECK <br />A. Roof Deck: Fabricate panels, without top -flange stiffening grooves, to comply with "SDI <br />Specifications and Commentary for Steel Roof Deck," in SDI Publication No. 30, and with the <br />following: <br />STEEL DECK 053100-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.