Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1 EDE- 4396- A716- 4C53B809027E <br />26 <br />b) Temporary filters shall be installed in each of the heating and air conditioning units, return air <br />grilles, and other locations to prevent intrusion of dust, dirt, and debris during construction. <br />Temporary filters shall be removed and replaced with new filters immediately prior to Substantial <br />Completion. <br />c) Extra effort shall be maintained to keep the building clean and under no circumstances shall <br />air systems be operated if finishing operations are creating dust in excess of what would be <br />considered normal if the building were occupied. <br />d) When the permanent lighting system is used during construction, lamps shall be replaced <br />and shall be new on the date of Substantial Completion. <br />ARTICLE 8. OWNER <br />8.1 The Owner shall issue communications and notices to the Contractor through the Designer <br />to the extent contemplated by the Contract Documents. <br />8.2 In case of termination of the employment of the Designer, the Owner shall appoint as <br />Designer a qualified person who shall have and assume all rights and duties held by the original <br />Designer. <br />8.3 The Owner shall have the right to take possession of and use any portion of the Work <br />notwithstanding the fact that the time for completion of such portion of the Work may not have <br />expired, but such taking possession and use shall not be deemed an acceptance of any Work <br />not completed in accordance with the Contract Documents. <br />8.4 A waiver on the part of the Owner of any breach of any part of the Contractor shall not be <br />held to be a waiver of any other or subsequent breach. <br />8.5 The Owner shall pay all permanent acreage fees, governmental impact fees, and meter <br />deposits for permanent utilities. <br />ARTICLE 9. CONSTRUCTION MANAGER <br />9.1 The Owner may employ one or more Construction Managers for the purpose of assisting the <br />Owner, Designer, and Contractor in developing and administering budgets and cost controls, in <br />evaluating constructability and value engineering proposals, in establishing and maintaining a <br />critical path method (CPM) schedule, in coordinating and /or expediting the Work with other <br />projects being constructed by the Owner or others adjacent or near the Work, or for such other <br />purposes as the Owner may deem appropriate. From time to time the Owner may identify such <br />Construction Managers(s) to the Contractor in writing identifying any tasks assigned to such <br />Construction Managers(s). <br />ARTICLE 10. DESIGNER <br />10.1 The Designer is charged with the responsibility of interpretation of the Contract <br />Documents. The Designer's decisions relating to aesthetic matters shall be final. <br />Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.