Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />A. Clean adjacent structures and improvements of dust, dirt, and debris caused by selective <br />demolition operations. Return adjacent areas to condition existing before selective demolition <br />operations began. <br />3.8 SELECTIVE DEMOLITION SCHEDULE <br />A. Existing Items to Be Removed and Salvaged: <br />1. Solid core wood doors. <br />2. Door hardware. <br />3. Other items as indicated on the Drawings. <br />B. Existing Items to Be Removed and Reinstalled: <br />1. Acoustical ceiling panels. <br />2. Aluminum window at temporary construction entrance to Building B. <br />3. Face brick at temporary construction entrance to Building B. <br />4. Other items as indicated on the Drawings. <br />Ca►1100] &y914011M to) ►[I z"IfL� <br />SELECTIVE STRUCTURE DEMOLITION 024119-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.