Browse
Search
2018-053-E AMS - HM Kern Passmore Addition
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-053-E AMS - HM Kern Passmore Addition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2019 4:16:44 PM
Creation date
2/26/2018 10:49:57 AM
Metadata
Fields
Template:
Contract
Date
1/23/2018
Contract Starting Date
1/23/2018
Contract Document Type
Agreement - Construction
Agenda Item
8-I
Amount
$494,820.00
Document Relationships
2019-180-E AMS - HM Kern Passmore Center landscaping contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-191-E AMS - HM Kern Corporation Passmore Center contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-053 AMS - HM Kern Passmore Expansion
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
630
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 313DA256 -1EDE- 4396- A716- 4C53B809027E <br />JERRY M. PASSMORE CENTER ADDITION AND RENOVATION <br />HILLSBOROUGH, NORTH CAROLINA <br />SECTION 024119 - SELECTIVE STRUCTURE DEMOLITION <br />PART 1 - GENERAL <br />1.1 RELATED DOCUMENTS <br />A. Drawings and general provisions of the Contract, including General and Supplementary <br />Conditions and Division 01 Specification Sections, apply to this Section. <br />1.2 SUMMARY <br />A. Section Includes: <br />1. Demolition and removal of selected portions of building or structure. <br />2. Salvage of existing items to be reused or recycled. <br />B. Related Requirements: <br />1. Section 011000 "Summary" for restrictions on the use of the premises, Owner - occupancy <br />requirements, and phasing requirements. <br />2. Section 017300 "Execution" for cutting and patching procedures. <br />1.3 DEFINITIONS <br />A. Remove: Detach items from existing construction and legally dispose of them off -site unless <br />indicated to be removed and salvaged or removed and reinstalled. <br />B. Remove and Salvage: Carefully detach from existing construction, in a manner to prevent <br />damage, and deliver to Owner ready for reuse. <br />C. Remove and Reinstall: Detach items from existing construction, prepare for reuse, and reinstall <br />where indicated. <br />D. Existing to Remain: Existing items of construction that are not to be permanently removed and <br />that are not otherwise indicated to be removed, removed and salvaged, or removed and <br />reinstalled. <br />1.4 MATERIALS OWNERSHIP <br />A. Unless otherwise indicated, demolition waste becomes property of Contractor. <br />B. Historic items, relics, antiques, and similar objects including, but not limited to, cornerstones <br />and their contents, commemorative plaques and tablets, and other items of interest or value to <br />Owner that may be uncovered during demolition remain the property of Owner. <br />1. Carefully salvage in a manner to prevent damage and promptly return to Owner. <br />SELECTIVE STRUCTURE DEMOLITION 024119-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.